Victoria Dock

Aqua Prep was called in to cut and demolish an old concrete wharf which had fallen into 12m of water, the cuts were 7m long and 375mm thick.

This was after the client persisted with hydraulic chain saw methods which proved to be unsuccessful.

Aqua Prep pooled its resources and industry partners to adapt our process and equipment to complete the job on time, saving our client time and tens of thousands of dollars.