Swanson dock steel replacement

Aqua Prep have been engaged to carry out hydro demolition works of the annulus in the cores of new piles as part of Swanson dock wharf’s rehabilitation works.  Alterations to the piles involve breaking out the pile core to a diameter of 1600mm from an initial diameter of 1000mm.

Utilising our newly designed and manufactured head that runs off the Aqua Cutter Robot, a 300mm deep section of concrete will be broken out to expose reinforcing and allow for new piles to be augmented with the existing deck slab.

Aqua Prep will also provide a small amount of handgun works to break out some shadows at the top of the slab.