Sheperds Bridge

Shepherds Bridge on Footscray Rd Melbourne is another vital piece of road infrastructure in Melbourne. Working with Fulton Hogan, Aqua Prep worked over three stages to allow for bridge widening and strengthening of the existing expansion joints. The final stage was carried out over a shutdown period operating 24 hours per day, allowing an on time reopening of the bridge for the Monday morning peak.

Aqua Prep drew on its vast network of industry partners to assist with non core works vacuum remove the rubble from site.

This project was the first time Aqua Prep carried out onsite waste water treatment. We were able to collect the water transfer to a water treatment plant that clarified and neutralized the waste allowing for it to be disposed of via the sewer.