Northern Drop Structure

Working with Remcon and CPB; Aqua Prep was engaged to cold cut a concrete mezzanine floor out of the Northern Drop Structure. The slab was 300mm thick with the majority of the steel within the bottom half of the slab.

In what proved to be a challenging but ultimately successful project Aqua Prep learnt, adapted and modified the process to get the outcome without exposing operators risks associated with working at heights within a confined space and from ultra high pressure water.