Bolte Bridge – Expansion Joint Removal

The Bolte Bridge is one of Melbourne most important roadways carrying thousands of vehicles every day. Working with CPB Aqua Prep was able to utilise its Aqua Cutter Robots to complete the works at night reducing the impact on traffic during the day and peak periods.

Four joints were completed with an average depth of about 350mm. The most challenging aspect of the works was the need to be very accurate with only 10mm of tolerance around bolts holding the temporary steel plates in position.