Appleton Dock Berths

Together with Fitzgerald Constructions (principal contractor) Aqua Prep carried out hydro demolition works to the underside of Berths E and F at Appleton Dock as part of wharf rehabilitation and strengthening. In total more than 65 cubic metres of concrete was removed in under 10 months.